6 weeks to pre-MVP: the Druffle chronicle

Druffle is a contactless service platform for hotels: guests scan a QR code in their room and order breakfast, laundry or spa treatments from their phone, while staff receive the request in a messaging app. We built the pre-MVP in six weeks by a hard deadline: 31 August. Six months later, on the same foundation, we grew a full MVP, and in spring the product went into pilots with real hotels. Below is what we worked through at each stage and what is worth repeating.
Emil I.
PMO at onema
6 weeks to pre-MVP: the Druffle chronicle — illustration for an onema article
The starting point: a date that can't be moved
For the founders Druffle had a hypothesis: hotel service shouldn't live at the end of a phone line. They set the pre-MVP deadline for 31 August, which was six weeks away. After that came partners, pilots with hotels and investor meetings, where you can't turn up with a presentation instead of a product.

The collaboration lasted nine months across three stages. Our remit was logic, development and integrations. UI design was done by the Druffle team.

Stage 1. Scenarios and request logic


The key decision at this stage: we built a closed request cycle, not a service showcase. We could have built a showcase for guests and stopped there — that's what most “hotel apps” look like. But a request that nobody handles is worse than a call to reception. So, together with the Druffle team, we designed the whole cycle: the guest creates a request → the administrator sees it in the dashboard and assigns a staff member → the staff member gets a notification and updates the status → the guest sees the result.

Three roles surround the cycle, each with its own job:
  • Guest. The QR code in the room is the sign-up, with no passwords or forms. Breakfast with a choice of date, laundry, spa, room change or upgrade, and contact with reception via messaging apps.
  • Administrator. Requests and statuses, room inventory, prices. Services are dynamic: each hotel adds its own, and the platform doesn't dictate the range.
  • Staff. Notifications go where people already are: a request with full details arrives in Telegram or WhatsApp via webhooks. Housekeepers don't need to install yet another app.

We also gave separate thought to the money side of a young product. Re-authentication is by SMS, and at launch the code can be received via a phone call instead, which is cheaper for unit economics. That way, decisions made at the scenario stage support the budget from day one. How to capture decisions like these in a document is covered in the guide “How to write an MVP specification”.

Stage 2. Pre-MVP by 31 August


The pre-MVP was ready by the deadline: six weeks from kick-off to a clickable product that the founders were already showing to partners.

Six weeks isn't a speed record; it's a consequence of scope. The pre-MVP included what needed to be shown to partners and tested on the market. Everything else waited for the next stage. How to choose a stack for a task like this is covered in the guide “How to choose a stack for an MVP”.

Stage 3. An MVP on the same foundation


The pre-MVP was neither thrown away nor rewritten. The full MVP was built up iteratively on the same foundation. The second version added:
  • statistics for hotels, by requests and services, with a date-range filter;
  • SMS gateways for authentication — sms.ru and smsc;
  • transactional emails via SendGrid;
  • two environments: the live druffleapp.ru instance for real hotels and a separate sandbox for testing.

Six months later, the product had become a full MVP: three roles, analytics, notifications via messaging apps, production and test environments.

Stage 4. Pilots and handover


In the spring, the platform went into pilots with real hotels. The founders went to investor meetings with a working product rather than slides. The project was then handed over to the client's infrastructure, with support during the transition period.

Takeaways worth repeating


The deadline as a tool. According to CB Insights (March 2026), of 431 venture-backed startups that shut down, 43% cited poor product–market fit among the reasons. The sooner a product reaches real people, the cheaper that test is. A hard date forces you to cut scope rather than stretch the timeline.

A cycle, not a showcase. Design the scenario end to end, from the guest's action to the staff's response. A showcase without request handling tests interest, not the product.

One foundation for every stage. A fast first release doesn't have to cost you a rewrite. Druffle's MVP grew out of the pre-MVP iteratively — the time went into new features, not into redoing old ones.

A sandbox before the pilots. The production and test environments were separated before launching with real hotels. Development experiments never reach live guests.
Key figures
  • Pre-MVP: 6 weeks, to a hard deadline of 31 August.
  • A full MVP six months later: three roles, analytics, notifications, production and test environments.
  • In the spring: pilots with real hotels and investor meetings with a working product.
  • Collaboration: 9 months, 3 stages. The project was handed over to the client's infrastructure with support during the transition period.
  • Team: developers, an analyst, a project manager. UI design was handled by Druffle.

A real-world example

FAQs

Cost calculation
Tell us where your product has hit a wall, in the estimate form
After the audit, we'll tell you what to migrate, what to keep and how much it costs
More articles