onema
AI solutions
MVP
Web development
Mobile apps
UX/UI design
Branding
Find out your project cost
office@onema.ru
Questions and suggestions
Get a cost estimate

How to write an MVP spec: 7 sections and an example

An MVP spec isn't 40 pages of specifications but a short document with 7 sections: hypothesis, user, one key scenario, what's NOT included, integrations, success criteria and constraints. A spec like this fits on a few pages, cuts down the back-and-forth with your contractor and lets them quote a fixed price. The sections and a completed example spec are below.
Emil I.
PMO at onema
How to write an MVP spec: 7 sections and an example — illustration for the onema article
Why write a spec if ‘we're agile’?
An MVP spec does two jobs. The first is for you: writing the hypothesis down instantly reveals what you're actually testing (often a revelation). The second is economic: with a clear spec we work at a fixed price; without one it's hourly billing and a ‘from–to’ estimate (see how we work).

A mistake costs far more than a spec. Two or three weeks of analysis and prototyping cost a fraction of what it takes to rework a product after three months of building in the wrong direction. For an MVP the amounts are smaller, but the proportion holds.

The 7 sections of an MVP spec


  1. Hypothesis— one sentence: “We believe that (who) will pay for (what) because (why).”
  2. User— who they are, where you’ll find them for testing, and how many you need.
  3. Key scenario— the user’s journey from entry to value, step by step. Just one. A second scenario is a second iteration.
  4. What is NOT included— the most important section: user accounts “for the future”, admin panels with every setting, a mobile app “while we’re at it”. Everything the hypothesis can be tested without goes here.
  5. Integrations— payments, delivery, accounting: only those without which the scenario doesn’t work.
  6. Success criteria— which figures after how many weeks mean “we keep building”: enquiries, payments, repeat visits.
  7. Constraints— budget, deadline, stack preferences (if any) and two points you can’t skip in 2026:
  • where data is stored— if the product collects sign-ups, enquiries or payments, decide on the hosting region and on every vendor that will process personal data (hosting, email, analytics, AI APIs). Under the GDPR and UK GDPR, transfers outside the EEA/UK need a legal mechanism — an adequacy decision such as the EU–US Data Privacy Framework, or standard contractual clauses — and each vendor needs a data processing agreement (DPA). In the US, state laws such as California’s CCPA/CPRA add their own notice requirements. This affects the choice of stack, so it is settled before the estimate. This is a general overview, not legal advice — check the specifics with your counsel;
  • which events to track— if the success criterion is “30 payments in a month”, the spec must state where and how payments are recorded: Google Analytics 4, database events, an export. Otherwise, a month later you’ll have nothing to check against.

Example: what a completed spec looks like


A hypothetical example: a service for booking a vet home visit. Here is what the sections look like in brief:
SectionWhat it says
HypothesisCat owners in Chicago will pay $40 for a vet home visit, because taking a cat to the vet is stressful for both of them
UserCat owner aged 25–45, 200 people from two neighbourhood Facebook groups for testing
Key scenarioChoose a service → enter address and time → pay → receive a confirmation with the vet's name
What's NOT includedVet account area, medical history, mobile app, loyalty programme, dogs
IntegrationsOnline payment, SMS confirmation. Vet schedules kept manually in a spreadsheet
Success criteria30 paid visits in the first month, cancellation rate below 20%
ConstraintsBudget: up to $8,500, launch in time for vaccination season. Customer data hosted in a US region chosen up front, with a DPA from each vendor. Payments counted by a database event
The longest row here is ‘What's NOT included’. That's how it should be. The budget in the example matches our price ranges: a no-code MVP starts from $6,000 (as of November 2026), and online payment and SMS are two more integrations.

Common mistakes


  • The spec describes a dream product, not a test. Warning sign: the document has more than three scenarios.
  • No ‘what's not included’ section. Then the development team will write it — out of your budget.
  • Success criterion: ‘users will like it’. Not measurable → not testable → the MVP hasn't done its job.
  • Technical solutions instead of goals— “we need a microservice in Go”. Describe the problem; the stack is a joint decision (how to choose).
Specs and AI generation
If you're building the prototype yourself in Lovable, Bolt or v0, you still need a spec — it is the basis of your prompt. The generator builds what's described and readily adds extras: the ‘What's NOT included’ section protects the prototype from unnecessary features just as it protects the estimate. The generator won't define success criteria or data requirements for you.

You can also put together a draft spec using our AI spec generator: it sorts your description of the idea into the same 7 sections. Even so, it's worth rereading the ‘What's NOT included’ section afterwards and adding to it by hand.

A real-world example

Druffle is a contactless service platform for hotels. Together with the founders, we designed a single closed-loop scenario: the guest creates a request → the administrator assigns a staff member → the staff member gets a messenger notification and updates the status → the guest sees the result. We built the pre-MVP around this loop in 6 weeks to meet a hard deadline of 31 August.

For the full MVP, the Druffle team handed us a spec, and we grew the product in iterations on the same foundation, without rewriting it. More in the Druffle case study.
How to put together your own spec
Take the table from the example above and replace each row with your own: seven rows, one per section. Start with the hypothesis and ‘What's NOT included’ — the rest is easier to fill in once those two sections are done. Bring a spec like this to our estimate form: we'll give you an estimate based on it without rounds of clarification.

FAQs

Cost calculation
Bring your spec to the estimate form
Based on the seven sections, we'll give you an estimate without rounds of clarification
More articles