1. How will I see progress? A good answer is specific: sprints, reports, access to tasks and interim versions. Our approach is a Data Room: the spec, design, builds and reports in one place, with access for you. Also check the practical side: will you get your own seat or admin access to the contractor’s tools, and can you export everything if the engagement ends?
2. Who writes the spec, and what happens when the scope creeps? A good answer includes the words ‘we write it down’: a change in scope means a recalculation, not a silent extension of the timeline (
how to write an MVP spec).
3. Which stack and which AI tools — and why? A dangerous answer is the same stack for every task. The stack is chosen based on the task and the budget (
how to choose a stack for an MVP). Ask about AI separately: according to the Stack Overflow 2025 survey, 84% of developers use AI tools or plan to, while in 2025 Veracode found vulnerabilities in 45% of code samples generated by AI models. A good answer explains where AI speeds up the work, who reviews the generated code and how the time saved shows up in the estimate.
4. What happens if deadlines slip? The question isn’t ‘will you miss the deadline?’ but ‘what then?’: a mature contractor has an answer about accountability; the rest just say ‘we never miss deadlines’.