onema
AI solutions
MVP
Web development
Mobile apps
UX/UI design
Branding
Find out your project cost
office@onema.ru
Questions and suggestions
Get a cost estimate

Redesigning a portal in 2 weeks: what you can realistically get done

The corporate portal of the service company Riche had grown haphazardly: dozens of pages in flat navigation, overloaded work screens. For the redesign we had two weeks. In that time we rebuilt the navigation, reworked six key pages, made mobile versions of two of them and put together a UI Kit with light and dark themes. Here’s why we started with navigation rather than the palette.
Sergey A.
COO at onema
Redesigning a portal in 2 weeks: what you can realistically get done — article illustration by onema
Why a tight deadline is a feature, not a compromise
For contrast: every year Nielsen Norman Group reviews the world’s best intranets. For the 2021 winners, the journey to a new portal took 17 months on average, and since 2014 the average has stayed at around 1.4 years. That is the full cycle, with development, content and a team of 17 people on average. A direct comparison isn’t possible: we did the design, not the whole cycle. But the order-of-magnitude difference shows where timelines come from: the urge to redo everything at once.

Two weeks don’t leave room for that. What changes is what employees see and use every day; everything else comes in later iterations. We didn’t start by repainting screens but with a UX analysis of the employee journey. The main problem turned out to be flat navigation, not colours, so our first decisions were about structure, not pixels.

What made it into two weeks


  1. UX analysis of the employee journey across work scenarios.
  2. Navigation: dozens of pages grouped into sections, a new sidebar.
  3. Redesign of six key pages — the ones where everyday work happens: “All tasks”, “My boards”, “Reviews”, “SLA and average rating”, “Products”, “Edit product”.
  4. Mobile versions of two pages — “Products” and “Edit product”.
  5. A palette based on the logo colours and a UI Kit in light and dark themes.

The team — three roles: UX/UI designer, art director, project manager.

How we handed over the system, so the portal doesn’t sprawl again


The portal grew on the principle of “need a page — add a page”. So the outcome wasn’t just six screens, but also the rules for building the next ones.

The UI Kit is the main safeguard for the future. The next portal page can be assembled from ready-made components according to its rules, with none of the “free-form creativity” that made the portal sprawl in the first place. And the dark theme doesn’t need a second set of mock-ups: when screens are built from components, switching themes is a property of the system. What a UI Kit is and how it differs from a design system is explained in the glossary.

After delivery, the client gave us their next project — the design and copy for their website.

Takeaways worth repeating


  • Navigation before pixels. If an employee can’t find a screen, a beautiful screen won’t help. A UX journey analysis shows where time is really being lost.
  • High-frequency scenarios instead of “the whole portal”. Six everyday work pages deliver an effect every employee can see. Everything else is built by the same rules.
  • A system instead of a set of mock-ups. A themed UI Kit turns a one-off redesign into rules for every page that follows.
Key figures
  • Timeline — 2 weeks.
  • 6 key pages, 2 mobile versions, light and dark themes, UI Kit.
  • Team: UX/UI designer, art director, project manager.
  • After delivery, the client gave us their next project — the design and copy for their website.

A real-world example

FAQs

Cost calculation
Tell us where your product has hit a wall, in the estimate form
After the audit, we'll tell you what to migrate, what to keep and how much it costs
More articles